-
How long is the delivery time of the product?
+A: The delivery time for samples is 15 days, and the delivery time for mass production is 45 days. In the case of molds, the delivery time after the order is confirmed is 10-15 days.
-
How is the price calculated?
+A: The price is based on the original price * 1.1 * 1.2, with a floating range of ± 10%. If tax is not included, the price is 1.35 times the original price. The specific price also varies according to the material (medium chromium, high chromium, ultra-high chromium, cast steel, manganese steel).
-
How is the product quality guaranteed?
+A: Our products have the following quality assurance:
Assembly accuracy reaches CT8
Hardness reaches HRc ≥ 58
Adopt advanced testing equipment such as spectrometer, fully automatic DISA line imported from Denmark, 5-ton melting furnace, full-process testing, including raw material testing, product warehousing testing, production process inspection and pre-delivery testing, and the product comes with a quality inspection report Process: DISA line, resin sand, coated sand and 3D sand mold printing -
What are the inspection methods?
+A: Our inspection methods include:
Spectrometer to detect chemical composition
Magnetic particle inspection
Three-coordinate measurement
Hardness detection
Wear detection -
What are the advantages of the company's products?
+A: Our advantages include: Short development cycle, fast product delivery, and quick satisfaction of the urgent parts needs of concrete mixing plants. High assembly accuracy ensures the precise fit of wear-resistant parts in the mixing plant and reduces wear. Long service life High hardness materials and precision machining extend the service life of wear-resistant parts. Participate in the formulation of national casting industry standards, and the quality is guaranteed. Customized production can be carried out according to customer needs to save costs. Reply to customer feedback within 1 hour, provide handling opinions within 24 hours, and promptly feedback reports on problematic products after quality inspection.
-
What are the payment methods?
+A: We mainly use FOB and wire transfer methods:
30% advance payment, 70% balance payment before leaving the factory
Settle before releasing the bill of lading
Settle within a period of time after releasing the bill of lading -
How does the company cooperate with dealers?
+A: Our cooperation with dealers includes:
Provide discounts after the purchase volume reaches a certain amount
Expand the scope of cooperation, such as jointly establishing a trading company
Provide consulting services, including spare parts and complete machine procurement services -
Does the company accept processing and customized production?
+A: Yes, we accept processing according to drawings, and design and produce wear-resistant parts according to the specific needs of customers, including the formulation of wear plans, material composition ratios, wear tracks and working condition analysis, etc.